a project in mind?

We are very interested to know your plans!

Ask for a quote
Contact us
employment opportunity

We are currently looking for distributors.

Contact us

The 3 stages of a residential project

Residential

PROJECT DESCRIPTION:

The 3 Stages of a Residential Project

Before:

Cracked concrete
Concrete and gravel

The aging concrete can become uneven and crack, making your pool deck dangerous to walk and very unattractive. In addition, your outdoor furniture is positioned very poorly on a cracked and uneven surface, which is a loss of space.

First Step: Leveling and repairing cracks

Levelling using Duraroc products
Our recycled tire product is used to level the ground

DURAROC uses a specialty recycled tire product that is cut into 5-10 mm pieces to fill gaps and cracks in your patio or pool deck. No need to demolish the actual concrete!

Second Step: Cutting and Colour Selection

Duraroc colour choice for concrete coating
Your choice of any combination of colours

Your unique combination of colours is carefully applied by hand with a trowel for a final thickness of 1/4 to 1/2 inch.

Third Step: Finishing and drying time

Another Duraroc's job done!
Application is seamless

The DURAROC coating is applied by trowel. Once the installation is completed, it can be used after 24 to 48 hours!

a project in mind?

We are very interested to know your plans!

Ask for a quote
Contact us
employment opportunity

We are currently looking for distributors.

Contact us